Week 8 - Safety Analysis + 4D model
Through collaboration with teammates from all universities, National Taiwan University and partners will lead the development of the safety action plan during the meeting using tools available in the virtual world to ensure that their YU, UW, and IIT teammates are familiar with this aspect of the design process. Teams will be encouraged to work collaboratively so that during the safety analysis phase, modifications to the cost estimate, and schedule will be noted and incorporated during the model optimization phase in Week 8.
In addition, the UW students will revise the 4D model to reflect the 3D model changes and any logistical updates from the cost estimating and safety analysis.
Things to think about when developing the safety action plan:
Through collaboration with teammates from all universities, National Taiwan University and partners will lead the development of the safety action plan during the meeting using tools available in the virtual world to ensure that their YU, UW, and IIT teammates are familiar with this aspect of the design process. Teams will be encouraged to work collaboratively so that during the safety analysis phase, modifications to the cost estimate, and schedule will be noted and incorporated during the model optimization phase in Week 8.
In addition, the UW students will revise the 4D model to reflect the 3D model changes and any logistical updates from the cost estimating and safety analysis.
Things to think about when developing the safety action plan:
- You will need to review both the 3D and 4D models to understand the construction work types so that you can identify the hazards and accordingly develop the methods of control. Therefore you will be working with the 3D modeling (IIT) and the 4D modeling teams (UW).
- You will be coordinating with the schedulers (VT) and the cost estimation team (UT). For example, your safety action plan may require a modification in the schedule or in the cost estimation.